Three contract structures
| Structure | How it bills | Typical pricing | Who carries the risk |
|---|---|---|---|
| Per-push / tiered per-inch | Each plowing event once accumulation reaches the trigger (often 2 in.), tiered by depth; salt billed per application or per ton | $200–$600+ per push for small commercial and retail strips; thousands per event on multi-acre lots | Property owner carries heavy-winter budget risk; contractor carries mild-winter overhead |
| Seasonal fixed (lump sum) | Equal monthly payments, typically November–March, for unlimited or capped events | $6,000–$10,000+ per season small-to-mid buildings; $10,000–$100,000+ multi-acre sites | Contractor carries weather risk; owner gets a fixed budget |
| Hybrid readiness fee | Lower monthly base for standby equipment and crew, plus reduced per-push and per-ton rates | Base plus discounted event rates | Shared |
Pre-treatment: brine versus rock salt
- Liquid brine anti-icing applied before a storm stops ice from bonding to pavement, cutting total salt use and first-hour slip risk.
- Rock salt loses effectiveness as pavement temperature drops; treated salt or blends work lower.
- Specify application rates or a salt-reduction target, and require application logs.
Service levels to write into the contract
- Trigger depth for plowing and for sidewalk clearing (sidewalks often zero-tolerance)
- Completion times: lots open before business hours, entries and ADA routes first
- Snow staging areas that keep drive aisles, hydrants and dock doors clear
- Re-treatment during refreeze; who monitors overnight conditions
- Site map with no-plow areas, curbs, islands and drains marked
- Time-stamped service logs and photos for slip-and-fall defense
- Insurance with snow operations included
Medical campuses, retail centers and logistics docks usually need the tightest service levels. Industrial truck courts also need staging plans that keep trailer parking usable.
Add a snow rider in the Commercial Estimator
