EvergreenLANDSCAPERS

RFP guide

Commercial landscape maintenance RFP scope & bid comparison guide

Bids can only be compared when every contractor prices the same scope. Use this matrix to write the RFP, then use the red flags to read the answers.

Freshly mulched planting bed with lilies and hostas beside a river-rock swale

Scope of work matrix

SectionWhat to specifySample language
Contract term & SLATerm, renewal, price escalator, response times, termination for cause“Two-year term; fixed price year one, 3% cap year two; 24-hour response to reported issues.”
MowingVisits per year by month (28–36), cut height, 1/3 rule, pattern alternation“32 visits: weekly April–September, bi-weekly March, October–November. Cut at 3.0–3.5 in.; remove no more than 1/3 of blade height.”
Edging & trimmingMechanical edging of curbs, walks and beds; trimming around obstacles“Hard edges mechanically edged every visit; bed edges re-cut monthly.”
Blow-downHard surfaces cleared, clippings kept out of drains“Blow all walks, curbs and lots after each visit; no debris into storm inlets.”
MulchBed area, depth, cubic yards, material, timing, no-volcano clause“Install 2 in. settled depth of double-shredded hardwood on 25,000 sq ft of beds (154 yd³) by May 15.”
Shrub pruningCycles per year, natural vs architectural form“Prune 3x per year to natural form; hand-prune flowering shrubs after bloom.”
Tree pruningANSI A300 type, height limit for maintenance crew, arborist work“Crown raising to 8 ft over walks per ANSI A300; no topping.”
Turf agronomicsRounds (4–5+), products, aeration, overseeding“5 rounds fertilization and weed control; fall core aeration on all irrigated turf.”
CleanupsSpring and fall cleanups, leaf removal count“Spring cleanup by April 15; 3 fall leaf removals; final cleanup by December 15.”
IrrigationStart-up, wet-check frequency, winterization, repair boundary“Monthly wet-checks included; repairs over $75 per visit billed T&M with approval.”
ReportingVisit slips, photos, walkthrough cadence“Digital visit report each visit; monthly walkthrough with property manager.”
Insurance & licensingCOI limits, workers’ comp, pesticide applicator license“$1M/$2M GL, auto, umbrella, workers’ comp; licensed applicator on site.”

Mulch cubic-yard table

Cubic yards = (bed sq ft × depth in inches) ÷ 324

Per 1,000 sq ft of bedCubic yards
2 in. depth6.2 yd³
3 in. depth9.3 yd³

Bid comparison red flags

  1. No mulch quantity. “Mulch beds annually” without cubic yards lets a contractor install an inch and call it done.
  2. Fewer than 28 cuts in a market with a normal growing season, or “as needed” mowing.
  3. Leaf removal unbundled and billed per event, turning a low bid into a high one every fall.
  4. Irrigation left vague: no wet-checks, or no stated repair boundary.
  5. Missing insurance or licensing, or a certificate that does not name the association or owner as additional insured.
  6. Pruning by “trim” only, with no cycle count and no reference to ANSI A300 for trees.
  7. Price far below benchmark. With labor at roughly a third of revenue, a bid 30% under the field is almost always a smaller scope.

Normalize the bids

  • Put every bid into the same line items as your RFP
  • Convert each to annual cost and per-acre per month
  • Add back excluded items (leaf removal, mulch shortfall, irrigation checks) at market rates
  • Check references from properties of the same type and size
  • Walk the site with the top two contractors before deciding

Generate your RFP scope summary Request a site walk

Get a site walk and an itemized proposal

Send your property or project scope. A vetted regional crew walks the site, measures turf, beds, grades and irrigation zones, and returns a fixed-price written proposal.